Line Salzburg–Villach–Karawanks Tunnel
Current length & type of the line
Salzburg–Loifarn [73.16 km]
34.7%
Loifarn–Klammstein [1.95 km]
0.9%
Klammstein–Bad Hofgastein [13.22 km]
6.3%
Bad Hofgastein–Angertalbrücke [2.55 km]
1.2%
Angertalbrücke–Kötschachdorf [2.64 km]
1.3%
Kötschachdorf–Bad Gastein [1.86 km]
0.9%
Bad Gastein–Villach [85.64 km]
40.6%
Villach–Gödersdorf [6.84 km]
3.2%
Gödersdorf–Rosenbach [16,78 km]
8%
Rosenbach–Karawanks Tunnel [1.68 km]
0.8%
Karawanks Tunnel–SB Slovenia [4,40 km]
2.1%
Line description by municipality

Railway line
Salzburg–Villach–
Karawanks Tunnel

Municipality of Sankt Johann im Pongau has one railway station—St.Johann im Pongau—on the railway line Salzburg–Villach. Upgrade proposal for this line—as part of the Corridor Sava: Salzburg–Villach–Jesenice–Ljubljana–Dobova–Zagreb—is a double-track line, electrification upgrade, with speeds up to 160 km/h and multi-level crossings.

Line upgrade proposal

Double-track |
Electrification upgrade |
Speeds up to 160km/h |
Multi level crossings |

To be confirmed on the local and inter-regional level.

Corridor proposal across the municipality

The municipality is part of the core corridor proposal Sava and nearby the extended core corridor proposal Julian Alps-Istria.

Corridor Sava proposal connecting Salzburg Ljubljana Zagreb
Sava Korridor

TEN_V-Kernkorridor Sava-Vorschlag, der Salzburg, Ljubljana und Zagreb verbindet.

Korridor Julische Alpen–Istrien
Julische Alpen–Istrien

Der Vorschlag für den Korridor Julische Alpen–Istrien umfasst zwei berühmte Strecken, die Bohinj-Bahnstrecke Jesenice–Sežana und die Strecke Divača–Pula.

Leave a comment