Current kilometres | tracks | electrification

260.1 km |
Electrified |
Double- & single-track |

Mostly double-track line, all electrified [15 kV 16.7 Hz].

Current length & type of the line
Vienna–Graz [211.4 km]
81.2%
Graz–Werndorf [18.2 km]
7%
Werndorf–Lebring-Sankt Margarethen [8.9 km]
3.4%
Lebring-Sankt Margarethen–Leibnitz [8.3 km]
3.2%
Leibnitz–Spielfeld-Straß–SB Slovenia [13.3 km]
5.2%
Legend:
Legend TEN-T railways network Slovenia current future proposal (540 x 90 px)
Line upgrade proposal

Double-track |
Multi-level crossings |
Speeds up to 160/250km/h |

Already in plan. In the State Styria the upgrade from Graz to complete double-track line to the border with Slovenia is already agreed. And the Semmering Base Tunnel is also in the upgrade, to be completed by 2028.

Line description by municipality

Railway line
Vienna–Graz–
Spielfeld-Straß–SB Slovenia [260.1 km]​

Federal province of Styria stretches over the Südbahn (English: Austrian Southern Railway). Upgrade proposal for this line—as part of the Corridor Danube–Mura–Drava–Sava is already in plan. Federal province of Styria is connected also to another core corridor proposal, corridor Drava–Mura–Raba–Danube.

Korridor Donau Mur Drau Sava
Donau–Mur–Drau–Sava Korridor

TEN_V-Kernkorridor der Wien und Zagreb über die bestehenden Strecken in Slowenien verbindet.

Drau–Mur–Raab–Donau Korridor
Drau–Mur–Raab–Donau Korridor

Vorschlag für den Kern-TEN_V-Korridor Drau–Mur–Raab–Donau: Osijek–Varaždin–Murska Sobota–Szombathely/Abschnitt Graz–Bratislava.

Hinterlasse einen Kommentar