Current kilometres | tracks | electrification
260.1 km |
Electrified |
Double- & single-track |
Mostly double-track line, all electrified [15 kV 16.7 Hz].
Line upgrade proposal
Double-track |
Multi-level crossings |
Speeds up to 160/250km/h |
Already in plan. In the Federal State of Styria the upgrade from Graz to complete double-track line to the border with Slovenia is already agreed. And the Semmering Base Tunnel is also in the upgrade, to be completed by 2028.
Current length & type of the line
Vienna–Graz [211.4 km]
81.2%
Graz–Werndorf [18.2 km]
7%
Werndorf–Lebring-Sankt Margarethen [8.9 km]
3.4%
Lebring-Sankt Margarethen–Leibnitz [8.3 km]
3.2%
Leibnitz–Spielfeld-Straß–SB Slovenia [13.3 km]
5.2%
Legend:
Line description by municipality
Railway line
Vienna–Graz–
Spielfeld-Straß–SB Slovenia [260.1 km]
Federal province of Styria stretches over the Südbahn (English: Austrian Southern Railway). Upgrade proposal for this line—as part of the Corridor Danube–Mura–Drava–Sava: Vienna–Graz–Maribor–Ptuj–Čakovec–Varaždin–Krapina–Zaprešić–Zagreb—is already in plan.
Table: Railway stations/stops on the line
No content found
Map: Railway stations of the current line by municipalities & location
Railway stations on the railway line Vienna–Graz–Spielfeld-Straß–SB Slovenia [260.1 km]. Presented on the map by municipalities.
[display-map id='25602']