Current length & type of the line

260.1 km |
Electrified |
Double- & single-track |

Mostly double-track line, all electrified [15 kV 16.7 Hz].

Vienna–Graz [211.4 km]
81.3%
Graz–Werndorf [18.2 km]
7%
Werndorf–Lebring-Sankt Margarethen [8.9 km]
3.4%
Lebring-Sankt Margarethen–Leibnitz [8.3 km]
3.2%
Leibnitz–Spielfeld-Straß–SB Slovenia [13.3 km]
5.2%
Upgrade proposal

Double-track |
Multi-level crossings |
Speeds up to 160/250km/h |

In the State Styria the upgrade from Graz to complete double-track line to the border with Slovenia is already agreed. And the Semmering Base Tunnel is also in the upgrade, to be completed by 2028.

Vienna–Graz–Spielfeld-Straß–SB Slovenia [260.1 km]
100%
Legend:
Legend interactive map railways of Slovenia and neighbour regions
Map: railway line by municipalities

Vienna–Graz–Spielfeld-Straß–SB Slovenia [260.1 km]

Railway points, including stations and stops of the line Vienna–Graz–Spielfeld-Straß–SB Slovenia [260.1 km]. Presented on the map by municipalities.

[display-map id='25602']
Line cities/ municipalities/ states

Line Vienna–Graz–
Spielfeld-Straß–SB Slovenia [260.1 km]
is crossing 39 municipalities and 3 states in Austria

The Southern railway line starts in Vienna and connected with Trieste already in the middle of the nineteenth century.

MORE ABOUT THE LINE

Leave a comment