
Current kilometres | tracks | electrification
260.1 km |
Electrified |
Double- & single-track |
Mostly double-track line, all electrified [15 kV 16.7 Hz].
Current length & type of the line
Legend:

Line upgrade proposal
Double-track |
Multi-level crossings |
Speeds up to 160/250km/h |
Already in plan. In the State Styria the upgrade from Graz to complete double-track line to the border with Slovenia is already agreed. And the Semmering Base Tunnel is also in the upgrade, to be completed by 2028.
Line description by municipality
Railway line
Vienna–Graz–
Spielfeld-Straß–SB Slovenia [260.1 km]
Federal province of Lower Austria stretches over the Südbahn (English: Austrian Southern Railway). Upgrade proposal for this line—as part of the Corridor Danube–Mura–Drava–Sava is already in plan. Federal province of Lower Austria is connected also to another core corridor proposal, corridor Drava–Mura–Raba–Danube.
Core TEN_T Corridor Danube–Mura–Drava–Sava proposal connecting Vienna and Zagreb.
Core TEN-T Coridor Drava–Mura–Raba–Danube proposal: Osijek–Varaždin–Murska Sobota–Szombathely/leg Graz–Bratislava.