Stanje infrastrukture železnic po občinah vkljucno s cezmejnimi regijami (1920 × 1080px)
Two of the three railway lines in the Mura region are non-operating. The Drava region has fragmented routes and low frequency of railway connections. The Carinthian region has barely the only remaining railway line with very low frequencies of rail connections.
Coridor Danube Mura Drava Sava

Core TEN_T Corridor Danube–Mura–Drava–Sava proposal connecting Vienna and Zagreb.

Coridor Drava–Mura–Raba–Danube

Core TEN-T Coridor Drava–Mura–Raba–Danube proposal: Osijek–Varaždin–Murska Sobota–Szombathely/leg Graz–Bratislava.

Gornja Radgona-Bad Radkersburg Leg

Extended Core TEN_T Corridor proposal re-connecting Gornja Radgona and Bad Radkersburg.

carinthia-rail-corridor-maribor-klagenfurt-cover-image

Extended Core TEN_T Carinthia Corridor proposal: Klagenfurt–Bleiburg–Prevalje–Maribor.

Paka–Savinja–Sotla Corridor(1920 × 1080 px)

Extended Core TEN_T Corridor proposal Paka–Savinja–Sotla: Dravograd–Celje/Leg Podčetrtek/–Krapina.

Corridor Zala–Mura–Drava Zalaegerszeg–Lenti–Lendava–Cakovec–Kotoriba–Murakeresztur–Kaposvar–Leg Nagykanizsa

Extended Core TEN_T Corridor proposal Zala–Mura–Drava: –Zalaegerszeg–Rédics–Lendava–Čakovec–Kotoriba–Murakeresztúr–Nagykanizsa–.