Current length & type of the line
210.7 km |
Electrified |
Double & Single-track
Mostly double-track line, electrified.
Salzburg–Loifarn [73.16 km]
34.7%
Loifarn–Klammstein [1.95 km]
0.9%
Klammstein–Bad Hofgastein [13.22 km]
6.3%
Bad Hofgastein–Angertalbrücke [2.55 km]
1.2%
Angertalbrücke–Kötschachdorf [2.64 km]
1.3%
Kötschachdorf–Bad Gastein [1.86 km]
0.9%
Bad Gastein–Villach [85.64 km]
40.6%
Villach–Gödersdorf [6.84 km]
3.2%
Gödersdorf–Rosenbach [16,78 km]
8%
Rosenbach–Karawanks Tunnel [1.68 km]
0.8%
Karawanks Tunnel–SB Slovenia [4,40 km]
2.1%
Upgrade proposal
Double-track |
Electrification |
Speeds up to 160km/h |
Multi level crossings |
To be agreed upon on the inter-regional level.
Salzburg–Villach–Karawanks Tunnel [210.7 km]
100%
Legend:

Map: railway line by municipalities
Salzburg–Villach–Karawanks Tunnel
Line from Salzburg to Villach, to Karawanks Tunnel has 42 railways stations/ stops, crossing 27 cities/ municipalities. Presented on the map by municipalities.
[display-map id='18386']