Kamniška Bistrica–Krka–Kolpa–Leg–Trebnje–Sevnica
mobilitatis omni railway interactive map legend
Current length & type of the line
Trebnje–Mirna–Šentrupert–Mokronog-Trebelno–Sevnica [31.2 km]
100%
Current kilometres | tracks | electrification

31.2 km |
Single-track |
Non-electrified |

More details below.

Line upgrade proposal

Single-track |
Electrification |
Speeds up to 120km/h |
Multi-level crossings |

To be confirmed on the local and regional level.

Line description by municipality

Railway line
Trebnje–Sevnica [31.2 km]

Municipality of Trebnje has two railway stations/stops—Trebnje
and Trebnje Kamna Gora—on its railway line Trebnje–Sevnica. Upgrade proposal for this leg—as part of the corridor Kamniška Bistrica–Krka–Kolpa—is a single-track line, electrified, with speeds up to 120 km/h and multi-level crossings.

Table: Railway stations/stops on the line
Map: Railway stations/stops of the current line by municipalities
[display-map id="22652"]
Railway line –Trebnje–Mirna–Šentrupert–Mokronog-Trebelno–Sevnica– Kamniška Bistrica–Krka–Kolpa Corridor

Leave a comment