Corridor length&type

61.2 km
single-track
partly disused
non-electrified

This leg has disused track from Ljutomer to Gornja Radgona and a missing link, the border railway bridge over the river Mura. In Austria the line from Spielfeld-Straß to Bad Radkersburg is already planed for upgrade.

Spielfeld-Straß–Bad Radkersburg [31.1 km]
51%
Cross-border bridge over the Mura river [ca. 4-7 km]
11%
Gornja Radgona–Ljutomer [23.1 km]
38%
Upgrade proposal: Spielfeld-Straß–Bad Radkersburg– Gornja Radgona–Ljutomer

72.2 km
Single-track
Electrification
Speeds up to 120km/h
Multi level crossings

For the Radgona/ Radkersburg leg we propose complete electrification and re-construction of the border railway bridge over the Mura river. Additionally, we propose new connection of this leg with the line Pragersko–Hodoš through/via Lipovci.

Spielfeld-Straß–Bad Radkersburg [31.1 km]
43%
Cross-border bridge over the Mura river [ca. 4-7 km]
9.7%
Gornja Radgona–Ljutomer [23.1 km]
32%
Vučja vas–Lipovci [11 km]
15.3%
Legend:
Legend TEN-T railways network Slovenia current future proposal (540 x 90 px)
Upgrade & specification

Leg specification and
and upgrade proposal background

Radgona/ Radkersburg Leg proposal re-enables railway connection of the cities of Gornja Radgona and Bad Radkerburg, that was broken at the end of the World War II. It would also re-enable the fourth railway border crossing between Slovenia and Austria.

This leg proposal ranges from Ljutomer to Gornja Radgona—with new track to Lipovci, where it would connect with Pragersko–Hodoš railway line and could as such serve as the second track of this line—and in Austria from Bad Radkersburg to Spielfeld-Straß, where it connects to the Austrian Southern Railway.

Crossing two countries this Comprehensive Trans-European Transport Network (TEN-T) proposal is connected with two core TEN-T Corridors:

The Comprehesive TEN-T railway corridor cover all European regions and are expected to be completed by 2050.

European Union (EU) provides funding for railway infrastructure and railway terminals also through EU Cohesion Policy. The co-financing rate of EU grants is up to 85 percent. Funding is channelled through the European Regional Development Fund (ERDF) and the Cohesion Fund (CF).