Current length & type of the line
Salzburg–Loifarn [73.16 km]
34.7%
Loifarn–Klammstein [1.95 km]
0.9%
Klammstein–Bad Hofgastein [13.22 km]
6.3%
Bad Hofgastein–Angertalbrücke [2.55 km]
1.2%
Angertalbrücke–Kötschachdorf [2.64 km]
1.3%
Kötschachdorf–Bad Gastein [1.86 km]
0.9%
Bad Gastein–Villach [85.64 km]
40.6%
Villach–Gödersdorf [6.84 km]
3.2%
Gödersdorf–Rosenbach [16,78 km]
8%
Rosenbach–Karawanks Tunnel [1.68 km]
0.8%
Karawanks Tunnel–SB Slovenia [4,40 km]
2.1%
Line description by municipality

Railway line
Salzburg–Villach–
Karawanks Tunnel

Market Town of Finkenstein am Faaker See has four railway stations/stops—Gödersdorf, Finkenstein, Faak am See and Ledenitzen—on the railway line Salzburg–Villach–Karawanks Tunnel. Upgrade proposal for this line—as part of the Corridor Sava: Salzburg–Villach–Jesenice–Ljubljana–Dobova–Zagreb—is a double-track line, electrification upgrade, with speeds up to 160 km/h and multi-level crossings.

Line upgrade proposal

Double-track |
Electrification upgrade |
Speeds up to 160km/h |
Multi level crossings |

To be confirmed on the local and inter-regional level.

Corridor proposal across the municipality

The municipality is part of the core corridor proposal Sava and nearby the extended core corridor proposal Julian Alps-Istria.

Koridor Sava
Koridor Sava

Predlog jedrnega TEN_T železniškega koridorja Sava: Salzburg–Beljak–Jesenice–Ljubljana–Dobova–Zagreb.

Koridor Julijske Alpe–Istra
Koridor Julijske Alpe–Istra–Kvarner

Predlog koridorja Julijske Alpe–Istra tvorita dve znameniti progi, Bohinjska proga, Jesenice–Sežana in proga Divača–Pula.

Pustite komentar